CASE STUDY

THE
RADIANT

Located just outside Leeds city centre, off Kirkstall Road, The Radiant is a multi-million-pound PRS (Private Rental Sector) development designed to offer stylish urban living through a mix of 1, 2 and 3-bedroom apartments. Situated in a rapidly developing area, the scheme capitalises on the city’s growing demand for high-quality, centrally located residential accommodation. The scheme of more than 100 units was sold to Aberdeen Standard Investments (ASI) for £17.25m. The development enjoys a prime location with proximity to Leeds city centre, a wide range of public transport options, and major employers including Channel 4, HMRC, Leeds General Infirmary.

CLIENT: HOLLYCROFT CONSTRUCTION

VALUE:

£2M

LOCATION:

LEEDS

CONTRACT PERIOD:

9 MONTHS

CONTRACT TYPE:

JCT STANDARD BUILDING SUB-CONTRACT

logo
CASE
STUDY

HOLLYCROFT CONSTRUCTION

HOLLYCROFT CONSTRUCTION

BACKGROUND

Developer KMRE appointed Hollycroft Construction as the main contractor, with Howard Civil Engineering selected to deliver a JCT Standard Building sub-contract  for a reinforced concrete (RC) frame package. Howard’s appointment followed a collaborative period of early engagement, where flexibility and transparency around programme management proved decisive. Despite delays in groundworks and piling (undertaken by others), Howard worked closely with Hollycroft to maintain alignment with the main contract programme.

The project required close coordination between multiple contractors on site. Howard’s proactive communication and clear interface management ensured seamless integration with other trades and subcontractors, particularly around core construction and formwork removal.

The constrained city centre site, combined with complex logistics, demanded precise planning and innovative working methods to ensure safe and timely delivery.

gray-bg

SCOPE OF WORK

Floor plate

10 storey building with a floor plate of 1200m²

Cores

2 cores constructed utilising a ‘Slipform’ construction method

Structural concrete

Over 4000m³ of structural concrete and approx. 750 tonne of rebar

TRUST US TO DELIVER YOUR PROJECT ON TIME AND ON BUDGET